Terms of Reference for the Construction of a Temporary Working Space for the Kitchen, Supply and Installation for the Lodges and Restaurant Veranda Refurbishment Tender at Urugo Women’s Opportunity Center (WOC)
1. Background
URUGO WOC intends to engage a qualified and experienced contractor to undertake the construction of a temporary working space for the kitchen, supply and installation of a tent for the lodges, and refurbishment of the restaurant veranda. The works are intended to ensure continuity of operations, improve service delivery, and enhance the overall functionality and appearance of the facilities.
2. Objective of the Assignment
The objective of this assignment is to:
All works must be completed in a professional, timely, and compliant manner.
3. Scope of Work
The contractor shall be responsible for, but not limited to, the following tasks:
3.1 Construction of Temporary Kitchen Working Space
3.2 Supply and Installation of Tent for Lodges
3.3 Restaurant Veranda Refurbishment
4. Work Plan and Methodology
Bidders must submit a detailed work plan that clearly outlines:
The work plan should demonstrate the bidder’s ability to complete the assignment efficiently within the required timeframe.
5. Duration and Deadline
6. Eligibility and Mandatory Requirements
Interested bidders must meet the following mandatory requirements:
Failure to submit any of the above documents will result in disqualification.
7. Submission Requirements
Applicants must submit:
Submission method:
Submission address:
URUGO WOC(Physical submission to the URUGO WOC office)
8. Financial Conditions
9. Evaluation Criteria
Proposals will be evaluated based on:
10. General Conditions
N.B: 1.
URUGO WOC allow the bidders to visit the site.
Details of the ToR
|
PROJECT TITLE: URUGO WOMEN'S OPPORTUNITY CENTER |
||||
|
LOCATION: KAYONZA |
||||
|
Bill of quantities for the Construction of a temporary working space for the Kitchen, Supply and installation of the tent for the lodges and Restaurant Veranda refurbishment |
||||
|
Sn |
Description |
Unit |
Quantities |
|
|
A |
Construction of the temporary working space for the kitchen |
|||
|
Scope of the work: • Construction of a temporary kitchen workspace (gross floor area: 3m x 7m). |
||||
|
1 |
Site leveling up to required depth in mix soils, shoring, transportation and dump within the selected area as per drawing, specification and direction of Engineer |
m3 |
3.0 |
|
|
2 |
Earthwork in back filling with filling materials which should be unfertile soil from nearby area including machinery compaction in 150 mm layers with sprinkling water required to obtain 90% density as per specification and instruction by Engineer. |
m3 |
8.0 |
|
|
3 |
E/W in excavation manually up to required depth in mix soils in foundation in trenches, shoring, dewatering, transportation and dump of the within the 10 m distance as per drawing, specification and direction of Engineer |
m3 |
10 |
|
|
4 |
Plain cement concrete (PCC) in 1:3:6 (1cement: 2coarse sand: 4aggregate) ratio for trenches and foundation top screed with approved quality of cement and sand and crushed stone aggregate including mixing, laying, curing etc. all complete in approval of site engineer. |
m3 |
1 |
|
|
5 |
Stone Work: Random Rubble masonry work in foundation & superstructure up to 5m in 1:4 cement mortar including supply of block & bond stone & transportation of 30 meters, as per drawing, specification and direction of Engineer. |
m3 |
12 |
|
|
6 |
Concrete (PCC) in 1:3:6 (1cement: 2coarse sand: 4aggregate) ratio for the floor with approved quality of cement and sand and crushed stone aggregate including mixing, laying, curing etc all complete in approval of site engineer. |
m3 |
4 |
|
|
7 |
Metallic structure done with vertical tubes 80x40mm, horizontal tube 40x40mm; roof structure with roof cover iron sheet BG28, gutter and down pipes and shelves done in metallic tubes |
LS |
1 |
|
|
8 |
Excavation of the new 6 meters pit filled with hardcore and covered by a RC cover with ventilation pipe to receive waters from the dishwashing area and storm waters |
LS |
1 |
|
|
9 |
Supply and installation of bamboos around the temporary working space |
LS |
1 |
|
|
10 |
Electrical installation for 2 lights, 1 socket and 1 switch |
LS |
1 |
|
|
B |
||||
|
1 |
Supply and installation of the tarpaulin tents for the lodges including cables to fix the tarpaulin tents. The quality of the tarpaulin must be the same as the existing. The supplied tarpaulin tents will be fixed over the existing |
Sqm |
528.0 |
|
|
2 |
Silicones to be fixed around the tent’s rooms |
LS |
1.0 |
|
|
C |
||||
|
1 |
Refurbishment of the restaurant veranda by replacing the old grass (Top part only), Replace top concrete cover and refixing the not well-fixed wood’s structure. |
LS |
1 |
|
|
2 |
Supply and apply the required paint on the timber structures same color as metallic structure for the restaurant. |
LS |
1 |
|
|
3 |
Supply and installation of the lights inside the veranda |
LS |
1 |
|
Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.