Hiring Audit Firm tender at Oxfam International - Rwanda
Website :
93 Days Ago
Linkedid Twitter Share on facebook

1 Introduction

The present document and the Annexes listed in Section 8 are the terms of reference (‘ToR’) on which the Contracting Authority agrees to engage ‘the Expenditure Verifier’ to perform a verification of expenditure reported by Reporting Entities.

The ToR will become an integral part of the contract concluded between the Contracting Authority and the Expenditure Verifier.

They apply to expenditure verifications contracted by the Commission or by the Reporting Entity and cover the verification of expenditure incurred under the EU financed contracts on the cover sheet.

2 Objectives and context

The Expenditure Verifier is expected. 

  • to carry out the agreed-upon procedures listed in Annex 2, and
  • to issue reports based on the template in Annex 3 which will support the Contracting Authority's conclusions on the eligibility of the reported expenditure and the related follow-up.

The expenditure verification will be performed as a desk review and fieldwork at the location indicated in Annex 1.

The Expenditure Verifier is not expected to provide an audit opinion. 

3 Standards and Ethics

The Expenditure Verifier shall undertake this engagement in accordance with:

  • the International Standard on Related Services (‘ISRS’) 4400 Engagements to perform Agreed-upon Procedures regarding Financial Information as promulgated by the IFAC;
  • the IFAC Code of Ethics for Professional Accountants, developed and issued by IFAC’s International Ethics Standards Board for Accountants (IESBA), which establishes fundamental ethical principles for Auditors with regard to integrity, objectivity, independence, professional competence and due care, confidentiality, professional behaviour and technical standards.

Although ISRS 4400 provides that independence is not a requirement for agreed-upon procedures engagements, the Contracting Authority requires that the Expenditure Verifier is independent from the Reporting Entity and complies with the independence requirements of the IFAC Code of Ethics for Professional Accountants.

4 Requirements for the Expenditure Verifier

4.1 General Principles

By agreeing these ToR, the Expenditure Verifier confirms meeting at least one of the following conditions:

The Expenditure Verifier is a member of a national accounting or auditing body or institution which in turn is a member of the International Federation of Accountants (IFAC) or ICPAR – Institute of Certified Public Accountants of Rwanda. 

  • The Expenditure Verifier is a member of a national accounting or auditing body or institution. Although this organisation is not member of the IFAC or ICPAR the Expenditure Verifier commits to undertake this expenditure verification in accordance with the IFAC standards and ethics set out in these ToR.
  • The Expenditure Verifier is registered as a statutory auditor in the public register of a public oversight body in an EU member state in accordance with the principles of public oversight set out in Directive 2006/43/EC of the European Parliament and of the Council (this applies to auditors and audit firms based in an EU member state)[1].
  • The Expenditure Verifier is registered as a statutory auditor in the public register of a public oversight body in a third country and this register is subject to principles of public oversight as set out in the legislation of the country concerned (this applies to auditors and audit firms based in a third country).

4.2 Qualifications, Experience and Team Composition

4.2.1 Qualifications and Experience

The Expenditure Verifier will employ staff with appropriate professional qualifications and suitable experience with IFAC standards and with experience in verifying financial information of entities comparable in size and complexity to the Reporting Entity. In addition, the verification team as whole should have:

  • Experience with programmes and projects related to External Relations funded by national and/or international donors and institutions. It is desirable that the team leader and, where applicable, the fieldwork team, i.e. either the audit manager (category 2) or the senior auditor (category 3) has experience with audits of EU funded External Relations actions.
  • Experience with audits/verifications in Rwanda.
  • Experience with audits/verifications of NGO sector in Rwanda.
  • Sufficient knowledge of relevant laws, regulations and rules in Rwanda. This includes but is not limited to taxation, social security and labour regulations, accounting and reporting.
  • Fluency in English and Kinyarwanda.
  • A good knowledge of French is added advantage.

4.2.2 Team Composition

The team of auditors required for this engagement will be composed of a category 1 auditor who has the ultimate responsibility for the expenditure verification and a team which is composed of an appropriate mix of category 4 auditors.

4.2.3 Categories of staff/experts

Category 1 – (Audit Partner)

A Category 1 expert (audit partner) should be a partner or another person in a position similar to that of a partner and be a highly qualified expert with relevant professional qualifications who assumes or has assumed senior and managerial responsibilities in public audit practice.

He/she should be a member of a national or international accounting or auditing body or institution. He/she must have at least 12 years of professional experience as a professional auditor or accountant in public audit practice. Experience with audit related services in beneficiary countries of EU External Action Programmes will particularly be taken into account for the evaluation at the level of specific contracts.

The audit partner will be the person who will be responsible for the specific contract and its performance as well as for the report that is issued on behalf of the firm. He/she has the appropriate authority from a professional, legal or regulatory body and is authorized to certify accounts by the laws of the country in which the audit firm is registered.

Category 2 – (e.g. Audit Manager)

Audit managers should be qualified experts with a relevant university degree or professional qualification. They should have at least 6 years of experience as a professional auditor or accountant in public audit practice including relevant managerial experience of leading audit teams.

He/she should be a member of a national or international accounting or auditing body or institution.

Category 3 – (e.g. Senior Auditor)

Senior auditors should be qualified experts with a relevant university degree or professional qualification and at least 3 years professional experience as a professional auditor or accountant in public audit practice.

Category 4 – (e.g. Assistant Auditor)

Assistant auditors should have a relevant university degree and at least 6 months professional experience in public audit practice.

4.2.4 Curricula Vitae (CVs)

The Expenditure Verifier will provide the Contracting Authority with CVs of the staff/experts involved in the expenditure verification. The CVs will include appropriate details for the purpose of the evaluation of the offer on the relevant specific experience for this expenditure verification and the qualifying work carried out in the past.

5 Scope

5.1 Contracts and Financial Reports covered by these ToR

The Contract(s) and Financial Reports subject to this expenditure verification are indicated on the cover sheet and in Annex 1.

5.2 Conditions for Eligibility of Expenditure

The conditions for eligibility are stipulated in the Contracts which are provided in Annex 1 (including riders).

Further documents (e.g. Financing Decisions, Financing Agreements, Framework Agreements) that the Expenditure Verifier might deem to be required for the purposes of this expenditure verification will be provided by the Contracting Authority on request.

Expenditure Verifiers will inform the Contracting Authority as soon as possible about any limitations in the scope of work they may find prior to or during the verification. 

The Expenditure Verifier will report any attempt by the Reporting Entity or its staff to restrict the scope of the verification, or any lack of co-operation on the part of the

Reporting Entity or its staff. The Expenditure Verifier will consult the Contracting Authority on what action may be required, whether or how the expenditure verification can be continued and whether changes in the verification scope or the timetable are necessary.

6 Verification Process and Methodology

6.1 Preparation of the Verification

The Expenditure Verifier shall contact the Reporting Entity as soon as possible (and no later than 7 calendar days) after the formal announcement by the Contracting Authority of the expenditure verification to the Reporting Entity, so as to prepare the verification and to agree on the timing for carrying out the expenditure verification, notably with regard to fieldwork (if any) (see Section 6.2. for applicable maximum time lags). The Expenditure Verifier will then also confirm with the Reporting Entity the location(s) indicated in Annex 1 and ensure that relevant supporting documents as well as key staff will be available during the verification.

6.2 Preparatory Meeting, Fieldwork, Desk Review

The Contracting Authority foresees a preparatory meeting with the Expenditure Verifier which will be held at Oxfam Rwanda Country Office, Street KG 201, Nyarutarama – House 46.

The field work or desk review shall commence as soon as possible and not later than 6 calendar days after the signature of the verification contract or the date of availability of the Financial Report (i.e. financial report, supporting documents and other relevant information).

6.2.1 Engagement Context, Materiality, Risk Analysis, Sampling

The Expenditure Verifier's procedures should include:

  • obtaining a sufficient understanding of the engagement context including the contractual conditions, the Reporting Entity and the applicable EC laws and regulations which are set out in Section 5 above (Scope). The Expenditure Verifier should pay specific attention to the contractual provisions relevant for the following aspects:
    • documentation, filing and record keeping for expenditure and income; o eligibility of expenditure and income; o procurement and origin rules insofar as these conditions are relevant to determine the eligibility of expenditure; o asset management (management and control of fixed assets; e.g. equipment).
    • cash and bank management (treasury); o payroll and time management;
    • accounting (including the use of exchange rates) and financial reporting of expenditure and income; and o internal controls and notably financial internal controls.

The understanding should be sufficient to identify and assess the risks of material errors or misstatements in the expenditure and revenue stated in the Financial Report in order to determine the size and structure of the expenditure sample to be tested, whether caused by error or fraud, and sufficient to design and perform further verification procedures.  

  • performing a risk analysis (Annex 2).

The outcome of the risk analysis has to be clearly described in the Verification Report (Annex 3, Section 2.1);

  • determining the sample size;

For the purpose of determining what the overall material misstatement or error is, the Expenditure Verifier will apply a materiality threshold of 2% of the total amount of the gross reported expenditure with a confidence level of 95%.

  • establishing the sample and selecting the individual items for testing (Annex 2).

The link between the risk assessment and the size and composition of the sample, as well as the sampling method (statistical/non-statistical) must be clearly described in the Verification Report (Annex 3, Section 2.2);

6.2.2 Fieldwork / Desk Review

The main task during the fieldwork or desk review will be to perform the substantive tests (Annex 2, Section 2). Key information about the testing process must be provided in the Verification Report (Annex 3, Section 4.1).

6.2.3 Debriefing Memo and Closing Meeting

At the end of the fieldwork or desk review, the Expenditure Verifier should prepare a debriefing memo, organize a closing meeting with the Reporting Entity in order to discuss the findings, obtain its initial comments and agree on additional information to be provided at a later date. The representative of the Commission in charge of the audit will be invited to attend the closing meeting.

6.2.4 Complementary Letter

The Expenditure Verifier may at any time during the expenditure verification process draw up a complementary letter to inform the Commission about facts and issues that are considered of particular interest and importance. Suspicions of fraud or irregularity should be reported immediately.

6.2.5 Documentation and Verification Evidence 

The evidence to be used for performing the procedures in Annex 2 is all financial and nonfinancial information which makes it possible to examine the expenditure declared in the Financial Report. 

The Expenditure Verifier documents matters which are important in providing evidence to support the report of factual findings, and evidence that the work was carried out in accordance with ISRS 4400 and these ToR.

6.3 Reporting

6.3.1 Structure and Content of the Report

The use of the Expenditure Verification Report template in Annex 3 of these ToR, including the annexed tables, is compulsory.

If the verification scope covers Financial Reports related to different Contracts, a separate and specific report should be issued for each Contract.

The report should provide basic information about the Contract and should describe the outcome of the risk analysis and its implications on the sampling. The report should also give an overview of the substantive testing and fully disclose the information regarding the items included in the expenditure population and in the sample. The report should finally detail the findings identified through the performance of the agreed-upon procedures.

The report should be presented in English. An executive summary of the report in English should be provided along with the report.

The Expenditure Verifier will submit a draft report to the Contracting Authority within 21 working days of the conclusion of the fieldwork or desk review. After the authorisation to do so by the Contracting Authority, the Expenditure Verifier will submit the draft report to the Reporting Entity and ask for its comments to be received within 21 working days. The Contracting Authority may foresee a meeting with the Expenditure Verifier before authorising the transmission of the draft report to the Reporting Entity. The target date for the Contracting Authority's authorisation to transmit the draft report will be 21 calendar days after receiving the draft report.

7 calendar days after receiving the Reporting Entity's comments, the Expenditure Verifier will submit a pre-final report to the Contracting Authority for comment and approval. The Contracting Authority may request the Expenditure Verifier to carry out additional work, in which case a reporting deadline should be agreed on a case-by-case basis

7 calendar days after receiving the Contracting Authority's comments, the Expenditure

Verifier will submit the final report for the Contracting Authority's approval.]

6.3.2 Expenditure Verification Findings and Recommendations

The factual findings shall be reported in accordance with the formats and criteria specified in the Expenditure Verification Report template (Annex 3). The description of findings will include the standard applied (e.g. art. xx of the General Conditions of the Contract), the facts and the analysis of the Expenditure Verifier. 

The verification report should include all financial findings made by the Expenditure Verifier, regardless of the amount involved. Changes in the financial findings occurring between the draft and the pre-final or final report as a result of the consultation procedure should be clearly and sequentially reported.

6.3.3 Debriefing Meeting with the Contracting Authority

The Contracting Authority foresees a meeting with the Expenditure Verifier following receipt of the pre-final report. This meeting will be held at Oxfam Rwanda Country Office, Street KG 221, House #46 Gishushu, Nyarutarama – at AEE Office.

6.3.4 Access to supporting documents

The Expenditure Verifier shall retain electronic copies of the supporting documents reviewed for all expenditure items included in the sample and provide them to the Contracting Authority upon request for a period of 5 years after the approval of the Final Verification Report.]

7 Other Matters

7.1 Contradictory Procedure and Follow-Up

After receipt of the final expenditure verification report the Commission will begin a formal contradictory procedure with the Reporting Entity. The purpose of this procedure is for the Commission to discuss and agree with the Reporting Entity the corrective measures and actions which arise from the findings in the final report. The Expenditure Verifier may, where appropriate, be requested to provide clarifications or additional information with regard to the final report.

7.2 Subcontracting

The Expenditure Verifier will not subcontract without prior written authorisation from the Contracting Authority.

8 Annexes

Annex 1 - Engagement Context / Key Information

Annex 2 – Guidelines for Risk Analysis and Verification Procedures

Annex 3 - Model for Expenditure Verification Report

How to apply.

Only one proposal per consulting firm will be accepted. Proposals must include the following:

  • Cover letter highlighting experience of similar work undertaken, why the consultant(s) are interested in this opportunity and what they can offer.
  • Technical proposal indicating study approach, methodology (sampling techniques) and work plan.
  • Financial proposal showing a clear budget breakdown at each activity stage and total amount expressed in Rwandan Francs.
  • Updated CVs of the research team with relevant work experience, formal education qualifications and 3 referees.
  • At least three certificates of completion/proof of completion of recent, similar research/studies.
  • Fluency in English and Kinyarwanda.
  • A good knowledge of French is required. 
  • Proof of RRA and RSSB clearance certificate.
  • Proof of VAT CERTIFICATE  
  • Proof of registration certificate confirming legally registered in Rwanda.

Where to apply 

Please submit your expression of interest, updated CV, technical proposal, and financial proposal to Kigaliprocurement@oxfam.org.uk,with copy to kigali@oxfam.org.uk not later than 16th February 2024 at 12 noon.

Job Info
Job Category: Tenders in Rwanda
Job Type: Full-time
Deadline of this Job: Friday, February 16 2024
Duty Station: Kigali
Posted: 02-02-2024
No of Jobs: 1
Start Publishing: 02-02-2024
Stop Publishing (Put date of 2030): 02-02-2066
Apply Now
Notification Board

Join a Focused Community on job search to uncover both advertised and non-advertised jobs that you may not be aware of. A jobs WhatsApp Group Community can ensure that you know the opportunities happening around you and a jobs Facebook Group Community provides an opportunity to discuss with employers who need to fill urgent position. Click the links to join. You can view previously sent Email Alerts here incase you missed them and Subscribe so that you never miss out.

Caution: Never Pay Money in a Recruitment Process.

Some smart scams can trick you into paying for Psychometric Tests.